{"id":2970282,"date":"2025-04-02T09:59:54","date_gmt":"2025-04-02T09:59:54","guid":{"rendered":"https:\/\/vattenindustrin.se\/?p=2970282"},"modified":"2025-10-14T14:18:49","modified_gmt":"2025-10-14T14:18:49","slug":"nytt-stoddokument-vid-upphandling","status":"publish","type":"post","link":"https:\/\/vattenindustrin.se\/en\/nytt-stoddokument-vid-upphandling\/","title":{"rendered":"New support document for procurement"},"content":{"rendered":"<h4 class=\"wp-block-heading\"><strong>To facilitate procurement within the water sector, the Water Industry&#039;s focus group for procurement issues has developed various guidelines and support documents and is now introducing a new one.<\/strong><\/h4>\n\n\n\n<p>The investment process for both new investments and renovations or purchases of goods and services within the water and sanitation sector is complex. The standard contracts that are often used only require construction according to the documents and do not address issues of function and performance testing.<\/p>\n\n\n\n<p>Together with a lawyer and with views from product suppliers, consultants and suppliers, a new guide is available as an addition to ABT 06. This addition serves as a selectable list for clients to pick parts from that are suitable for the current procurement.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/vattenindustrin.se\/en\/upphandling\/\">Explore the Water Industry Support Documents<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>","protected":false},"excerpt":{"rendered":"<p>F\u00f6r att underl\u00e4tta vid upphandling inom VA har Vattenindustrins fokusgrupp f\u00f6r upphandlingsfr\u00e5gor tagit fram olika guidelines och st\u00f6ddokument och kommer nu med en nyhet. Investeringsprocessen vid s\u00e5v\u00e4l nyinvesteringar som upprustning eller ink\u00f6p av varor och tj\u00e4nster inom VA \u00e4r komplex. De standardavtal som ofta anv\u00e4nds st\u00e4ller endast krav p\u00e5 att bygga enligt handling och tar [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":2970275,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[58],"tags":[],"class_list":["post-2970282","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-upphandling"],"acf":[],"_links":{"self":[{"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/posts\/2970282","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/comments?post=2970282"}],"version-history":[{"count":4,"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/posts\/2970282\/revisions"}],"predecessor-version":[{"id":2970853,"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/posts\/2970282\/revisions\/2970853"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/media\/2970275"}],"wp:attachment":[{"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/media?parent=2970282"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/categories?post=2970282"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/tags?post=2970282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}