{"id":2970888,"date":"2025-10-15T15:11:34","date_gmt":"2025-10-15T15:11:34","guid":{"rendered":"https:\/\/vattenindustrin.se\/?post_type=document&#038;p=2970888"},"modified":"2025-10-15T15:11:35","modified_gmt":"2025-10-15T15:11:35","slug":"totalentreprenad-enligt-abt06","status":"publish","type":"document","link":"https:\/\/vattenindustrin.se\/en\/dokument\/totalentreprenad-enligt-abt06\/","title":{"rendered":"Turnkey contract according to ABT06"},"content":{"rendered":"<h4 class=\"wp-block-heading\">The purpose of standardized terms and conditions is to reduce uncertainty, the risk of misinterpretation, the workload for the parties and thus the costs.<\/h4>\n\n\n\n<p>Turnkey contracts refer to contracts where the contractor, in addition to the actual execution, must also produce all or a significant part of the design. The delivery agreement that can be applied in this case is ABT 06 and refers to general provisions for turnkey contracts regarding building, construction and installation work.<\/p>\n\n\n\n<p>ABT 06 is basically for projects with buildings and not process technology facilities and therefore needs to be supplemented to take this into account, see tips in the document.<\/p>\n\n\n\n<p><em>Last revised: 2023.09.06.<\/em><\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Syftet med standardiserade villkor \u00e4r att minska os\u00e4kerheten, risken f\u00f6r feltolkningar samt arbetsb\u00f6rdan f\u00f6r parterna och d\u00e4rmed kostnaderna. Totalentreprenader avser entreprenader d\u00e4r entrepren\u00f6ren, ut\u00f6ver sj\u00e4lva utf\u00f6randet, \u00e4ven ska ta fram hela eller en v\u00e4sentlig del av projekteringen. Det leveransavtal som kan till\u00e4mpas i detta fall \u00e4r ABT 06 och avser allm\u00e4nna best\u00e4mmelser f\u00f6r totalentreprenader ang\u00e5ende [&hellip;]<\/p>\n","protected":false},"template":"","meta":{"footnotes":""},"categories":[58],"class_list":["post-2970888","document","type-document","status-publish","hentry","category-upphandling"],"acf":[],"_links":{"self":[{"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/document\/2970888","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/document"}],"about":[{"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/types\/document"}],"version-history":[{"count":2,"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/document\/2970888\/revisions"}],"predecessor-version":[{"id":2970891,"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/document\/2970888\/revisions\/2970891"}],"wp:attachment":[{"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/media?parent=2970888"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vattenindustrin.se\/en\/wp-json\/wp\/v2\/categories?post=2970888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}